Before starting the demolition activity, during the demolition phase and after the demolition, safety measures and environmental protection measures are taken for demolition workers and third parties, as stipulated in the relevant legislation.
Soil, construction and demolition wastes that will arise during and as a result of the works to be carried out are collected, transported and disposed of in a way that does not harm the environment and human health and safety.
Regarding the noise emissions to be generated during excavation, construction/repair/renovation and demolition operations, the principles of the Noise Control Regulation, published in the Official Gazette dated 11/12/1986 and numbered 19308, shall be complied with.
During the extraction of the soil, measures are taken to reduce noise and visual pollution and dust emissions, and the area around the activity area is closed.